
The timing of this install was perfect. There was a few major pieces of equipment being removed, replaced or upgraded which allowed us to perform the installation In an extremely short time frame. Our install team were able to use all the existing fitting locations too, which helped to speed up the process even more.
There were a few iterations of this install which we worked through to maximise the return on investment and provide the best outcome with minimal investment. We were able to take advantage of the SA REPS credits and provide an outstanding changeover and exceptional ROI.