Case Study: Laminex, VIC

  • 67% Energy Reduction
  • Estimated 5,918 tonnes of CO2 emission reduction
  • Estimated $1,140,000 saving over lifespan of the upgrade
  • Significantly increased LUX levels

After a successful lighting upgrade at Laminex’s manufacturing facility in Ballarat, ELWA Energysavers was engaged by Laminex once again to upgrade their Cheltenham site over to bright, sustainable LED lighting. This project was a massive undertaking and perfectly timed during their expansion of the facility as they expand their production capacity within the site.